Solar and Storage – Testing and Commissioning
Prior to commissioning the system I needed to run through the inspection and testing for the solar sub panel. Many of the tests did not apply as the relevant wires are simply not present – the array cables are 2 core live/neutral (no earth conductor), so R1/R2 testing cannot be carried out. I could still…