Garage Conversion Part 3 – Insulation and Plasterboard

Friday15th April

Almost a week later, the floor is dry enough to walk on and work can continue.
The remaining battens were installed at the utility room end.

Saturday 16th April

Insulation was cut to size and rockwool pressed into the areas where it was not really going to be possible to fit slab insulation.

Utility room end.

 First layer of plasterboard goes up

A wall has been built for the utility room, unfortunately, I forgot to take any construction photos.

The utility room also receives a layer of plasterboard.

 View from utility room door at back of garage.

Sunday 17th April 

Battens fixed to the inside wall of the cinema room.

View of inside wall of utility room.

Framing around the utility room door

Insulation installed on the house side of the cinema room

Second layer of plasterboard going up on the outside wall of the cinema room – 3 tubes of green glue per sheet!