Before we could convert the garage attached to the house, we needed to build a new garage at the bottom of the garden.
Work started in June 2008, to clear the area at the bottom of the garden.
First order of business was to fell a 60 foot fir tree which was dropped into the garden itself and then chopped up.
The ground work and concrete slab build for the garage was performed by Judge Paving.
Tree stump finally removed – required a JCB to finally pull it out.
Shuttering in place and filled with hard core
Ready to start pouring concrete
Reinforcing mesh was also added to each half of the slab for additional strength.
One half done
The second half was poured a few days later, then after final drying and removal of the shuttering, we have a finished slab.