Close

Redecorating Part 9 – Bedroom 2 Preparation

Saturday 24th March

With the Box room plastered and drying, we had a week to clear the other two first floor bedrooms, strip the wall paper and cover in green grit ready for the return of the plasterer.

Once again I forgot to take any pictures prior to starting work.

These pictures show the second bedroom after removing the paper from the ceiling, the laminate flooring and the skirting.

I also moved all of the sockets from their original locations on the skirting to sensible locations further up the walls.

Front view.

 Right hand side.

 Left rear corner

Sunday 25th March

As with the box room it was necessary to coat the room with green grit ready for the plasterer to start work on Monday.

Front right corner.

 Front left corner.

 Right rear corner.

Leave a Reply