New Garage Part 3 – The Main Build Day 2

Day two of the build involved fitting the roof, garage doors and all the remaining cosmetic pieces.

First half of the roof

Second half

Fascia boards fitted

 Finished front

 View from inside – a fillet of cement was also added to prevent water ingress at floor level.

 Doors down

 Finished rear

 Finished side

I was very impressed with the speed of installation and quality of the garage.

The next job was to paint the floor with two coats of grey flooring paint before moving all of my junk treasured belongings from the main garage to this one.