Day two of the build involved fitting the roof, garage doors and all the remaining cosmetic pieces.
First half of the roof
Second half
Fascia boards fitted
Finished front
View from inside – a fillet of cement was also added to prevent water ingress at floor level.
Doors down
Finished rear
Finished side
I was very impressed with the speed of installation and quality of the garage.
The next job was to paint the floor with two coats of grey flooring paint before moving all of my junk treasured belongings from the main garage to this one.